It can be carried by hands and its unique shape provides excellent strength.
Lightweight as its weight is approx. 1/3 of the lightweight steel sheet pile.
With the same shape on both sides, installation works can be done without caring about directions of front/back on the aluminum sheet pile and work efficiency is improved.
4 projection bars pinch both sides of the sheet pile and installation works can be done easily and quickly.
Overall temporary earth retaining for small drilling works up to depth of 3.8m such as gas pipe underground installation works, water supply and sewer pipe constructions, etc.